If we don't approve Yucca Mt., then what do we do with the wastes?:
"H.O.S.S." it:
"Hardened On-Site Storage" It!
IEER NUCLEAR WASTE MANAGEMENT PLAN
June 4, 2002
Click here for PDF version of Factsheet
[NOTE: It has been pointed out that even if no more "high-level "radioactive wastes (HLRW) were produced, we would still have to do something with the wastes we have, until such time as a final repository were opened. It's also obvious since 9/11 that the current safety and security practices currently employed to manage HLRW at reactors are inadequate and unacceptable. "What is the alternative?", environmentalists are asked.
Alternatives exist -- "HOSS" is one. Many feel it's better to be deliberate and not err, than implement an obviously flawed plan just to say "we had to do 'something.'" With HLRW, if we do "something," it must be the "right" thing, because we won't get a second chance to be wrong.]
IEER advocates the following program be carried out by an institution that does not have the conflict of interest that the U.S. Department of Energy (DOE) does, and under more stringent public health and environmental protection standards than those currently in effect:
Interim Management
Interim Hardened On-Site Storage (HOSS) (different from spent fuel pools and dry casks now used) should be used for all spent fuel that can be moved out of pools. Pool storage should be minimized. No new above-ground dry storage of the present varieties should be licensed. Current dry storage should be converted to HOSS. The federal government should pay for HOSS at closed power plant sites since it has defaulted on its obligation to begin taking the waste on January 31, 1998, and has large amounts of ratepayer money dedicated to waste management that it has not spent.
Goals: Hardened On-Site Storage should be able to withstand most terrorist attacks without significant off-site releases. A second level goal is to prevent catastrophic off-site releases in case of even severe attacks. There could be defense in depth as part of the system.
The technology to accomplish HOSS is available.
Interim Hardened On-Site Storage (HOSS) should meet the following criteria:
On-site storage would be needed for ~50 to 60 years ?? not much different from what is projected to occur at present.
Long-term Management
The long-term repository plan should proceed as follows:
Ten years of the following scientific and engineering work:
After this initial work, the process of selecting 2 or 3 repository and natural analog types would be initiated for concentrated work (10 yrs.). Then site selection (10 yrs.).
If the process is sound,disposal could in principle happen in the twenty years to follow. The total time for complete disposal of fuel from existing power plants (40 year license) would be roughly 50 years, maybe sixty. If the power plants are closed down the overall timetable would not be longer than envisioned for Yucca Mountain now.
For more information:
Institute for Energy and Environmental Research (IEER)
6935 Laurel Ave. Suite 204
Takoma Park, MD 20912 USA
tel. 1-301-270-5500
fax 1-301-270-3029
EMail: ieer@ieer.org
Web: http://www.ieer.org
Locally:
Contact NEIS
P.O. Box 1637, Evanston, IL 60204-1637
Phone 847.869.7650 Fax 847.869-7658
EMail: neis@neis.org
Home | About US | Join NEIS | Contact | Upcoming Events | Take Action | Alerts | Donate | About Nuclear Power | For the Press | Literature | Newsletter | For Young People | Links
Copyright 2002, 2004 NEIS, Nuclear Energy Information Service
Last Revised August 31, 2004